Structural News
June 1, 2006 is the Minerals Management
Service (MMS) submittal deadline for platforms requiring
an Ultimate Strength Analysis for platforms that falled
the initial screening phase and the Design Level
Analysis. The Ultimate Strength Analysis can be
both linear and non-linear (pushover)..
Notice to Lessee (NTL) Number 2003-G16 was issued by the
Minerals Management Service (MMS) mandating that all platforms go through an
assessment process per API RP 2A 21st Edition Section 17.
|
|
|
About the Company
|
Axiom Consulting Engineers, LLC has extensive experience in
the structural design, modification, and assessment of offshore platforms
for the Oil & Gas industry.
|
We specialize in structural work since we do not want to be everything to
everyone. We want to provide you the best structural service for your
structural needs.
Our engineers can design a fixed offshore platform or minimal structure as
well as perform a platform assessment per Section 17 of API RP 2A. From
Topsides to Hull Systems, you can also count on the experience our engineers have with
deepwater projects.
|
Structural Services
Platform
Assessments
 Conceptual Design
 Jacket Design
 Deck Design
 Freestanding Caisson Design
 Braced Caisson Design
 Skid Design
 Front-End Engineering Design
 Fabrication Support
 Installation Support
 Programming Services
|
Free Downloads
 Web-based Utilities
 Technical Software
 Assessment Forms
 MMS Workshop Documents
 Links to useful websites
|
|
|